“Pittsburgh’s Best Kept Secret”
Pennsbury Village Borough
1043 Pennsbury Blvd.
Pittsburgh, PA 15205
P: (412) 279-7876
Office Hours:
Tuesday & Thursday: 9:00 – 5:00pm
                     By Appointment Only
               No Walk-in Access Due To
                             CoVid 19
Borough News

Road Repair Update: Concrete Tire Stops Reinstallation
Please click on the “Concrete Tire Stops Reinstallation” link below for info concerning the concrete tire stops reinstallation schedule. Cars will need to be moved at locations designated on Road Project webpage:
Concrete Tire Stops Reinstallation

 

Food Truck Tuesdays Return
Cindy Magri, Borough Chair for Food Truck Tuesdays, has posted the following schedule.
Food Trucks will be available between
4:30 – 7:30pm.

Food trucks will be located on Pennsbury Blvd. South near the intersection with Carriage Circle.

September 15 – Rolling Meatballs
September 22 – Steve and Benny’s Chicken Shack
September 29 – Totopo
October 6 – DeBlaze Food Truck
Pre-orders available on day of event up to 4:30 pm
October 13 – Railyard Mobile
October 20 – Burgh Bites

See attached pdf for more info:
food truck schedule pdf

 

2020 Road Project Completed
Our year 2020 road project has been completed. The Borough would like to thank everyone for their cooperation.
Because we have three more years of summer road construction, we are asking for suggestions that might make life easier for everyone during future road construction.
Use this link to send comments to the Borough:
Contact Us

 

Lock Your Car Doors
There have been some recent cars break ins. By locking car doors, you can prevent criminals from accessing your belongings.

 

Borough Council General  E-Meeting
(August General Meeting)
Tuesday, September 8 at 6:30pm
Zoom Room will open at 6:20pm

Join Zoom Meeting by computer/tablet:
Zoom Meeting Link
Meeting ID: 854 5315 7880
Password: 1977-2020

Dial in from any phone (audio only):
+1 646 558 8656  or
+1 301 715 8592

Meeting ID: 854 5315 7880
Password: 19772020

 

Borough or Condo?

For any matters concerning the swimming pool, tennis courts, community room rental, contact the Pennsbury Village Condominium Association at (412) 276-5100 or by email at office.pvca@verizon.net. Click on the following hyperlink for a list of the responsibilities of the Borough Council and of the Condominium Association, please visit the:
Borough Council and Condo Association Chart

Power Outages in Pennsbury Village

Do not contact the Mayor or Borough Council Members concerning power outages. Contact Duquesne Light Company to report an outage and receive outage updates:
Phone: 412-393-7000
Weblink: Duquesne Light – Report Power Outage

Our Wage Tax Code

                 PSD Code: 731003

Road Project

Note:  We will update this site at least twice a day in the morning, in the evening and through out the day as needed during the project.  If this site does not appear to have been updated (Monday thru Friday), try clearing your browser’s cache or clicking on reload current page icon.  With most browsers you can also use CTRL R to refresh the page. 

 

Project Updates:                  09/17  11:20am    –    Parking Restrictions for Concrete Tire Stop Installation

  • Pennsbury Blvd. North is now completed.  Parking is now open.  Please move your vehicle back into your normal parking spot.
  • The six parking spots on Pennsview Court are also now completed and open for parking.
  • Thank you for your cooperation!
  • Concrete Tire Stop Installation
  • The concrete tire stops that are located in all parking spaces on the section of Pennsbury Blbd. South (starting after the double carport until the stop sign at Pennsview Court) and on Pennsbury Blvd. North (starting at Pennsview Court to the stop sign at the end nearest Countryview Court) will be reinstalled this week.
  • The contractor believed that the stop bars could be installed without moving your vehicles, but he was wrong.  Due to where they are now located, he will need to use a tractor with a lift to pick them up.  Because they are in the grass in front of the parking spaces, we must ask you to move your vehicle, one last time, from the parking slots in front of the buildings.
  • We will allow parking, within reason on the opposite side of these streets to parallel parking.  Please don’t park in front of the fire hydrants or on the sharp curb that is already posted “No Parking”.
  • The Pennsbury Blvd South section shown in YELLOW on the map, will be done on Wednesday, September 16 starting at 7:00am.
  • The Pennsbury Blvd. North section, shown in BLUE on the map, will be done on Thursday, September 17th starting at 7:00am.
  • Once you see that the stop bars have been placed on the new road surface, you may move your vehicle back to its normal parking space.
  • Please have your car moved back to its normal parking space by 5:00pm at the latest.

 

Thank you!

  • Our year 2020 road project has now been completed.
  • We would like to thank everyone for their cooperation during this time.  It made all our jobs a bit easier.  Because we have three more years of summer road construction to look forward to; we are asking for any suggestions you may have that could make life a bit easier for everyone during the future road construction.  Please send your comments to us using: Contact Us

 

Good Advice:

  • Drivers on Pennsbury Blvd North and South are reminded that the concrete wheel stops are not in place at this time and to exercise caution when pulling into your parking space.
  • Drivers who are parking on the newly paved streets are asked to not turn their steering wheel unless the car is in motion (do not turn your steering wheel to one side and then back out of your parking space – turn the wheel as you back up).  Turning your steering wheel while stopped will rut the pavement because even though it has cooled, it is still somewhat soft.  When it rains, this will show itself as big puddles where your two front tires usually sit on the pavement when parked.  Once the weather cools down a bit this will not be a problem.

 

Project Map:

 

Road area in Blue is scheduled for Wednesday, September 16th at 7:00am

Road area in Yellow is scheduled for Thursday, September 17th at 7:00am

 

The Project Overview:

The Borough has embarked on a new four year project of road maintenance in Pennsbury Village.  Over a four year period, we will be milling, doing base repairs, paving all the roads, courts and parking areas and line painting in the Borough.  The total project cost is estimated to be approximately $1.5 million dollars!

Because sections of roads will need to be closed for the work; parking is going to be a bit of a challenge.  While we will relax some parking restrictions we urge you to use common sense if you need to select a non-standard parking spot

 

Flyers Downloads:

Concrete Tire Stop Installation Flyer

Print Friendly, PDF & Email